For generators · RenewaBlox with tem
Every kilowatt‑hour,
put to work.
Through tem and P442, a better PPA for renewables of all types. Through RenewaBlox, any excess monetised, with compute at the point of generation.
Free PPA check
Find out your PPA uplift now
Submit your export MPAN and PPA end date or send a recent PPA statement.
Where do I find my export MPAN?

It’s on your PPA statement and your export meter’s paperwork, in a box marked S. Your export MPAN is the 13 digits on the bottom row.

or
Sent straight to energy@renewablox.co.uk
How it fits together
Two partners.
No watt wasted.
tem lands you a better PPA for the power you export. RenewaBlox monetises the excess: whatever the grid can’t take, or won’t pay enough for. For renewables of all types — solar, wind, hydro and fuelled.
A week of generation, illustrated
tem · P442
A better PPA
Under P442, tem links your eligible output to UK businesses’ usage. On that share, government scheme levies aren’t charged — value that lands you a better PPA.
Solar · Wind · Hydro · AD and CHP
RenewaBlox · BLOX
Excess, monetised
What the grid can’t take, or won’t pay enough for, powers BLOX compute beside your plant — revenue, not curtailment.
Export limits · Curtailment · Low or negative prices
01AD · Biogas · CHP
Fuelled Renewables
Your engine runs steady. The price doesn’t.
Anaerobic digestion, biogas and CHP: generation you fuel and run all year, sold into a power price that changes every half hour — and on some half hours falls below zero. Compute on site gives the cheap half hours somewhere better to go.
1 A better PPAthrough tem and P442
2 Then, optimise revenues with RenewaBloxour strategy, in the Peaker Plant model
Interactive 3D Live dispatch · every half hour
The model
Peaker Plant model
A 499 kWe biogas CHP with a BLOX compute load bank beside it. Its 350 kW tradable block follows the price, half-hour by half-hour.
  • Above the strike price, the block exports to the grid.
  • Below it, the compute load bank absorbs it on site instead.
  • Drive the dispatch desk through four real GB price days.
Explore the Peaker Plant modelthe model →
02Hydro · Off-grid · Constrained
Stranded Renewables
Power with nowhere to go, used where it’s made.
Generation the grid can’t take, or won’t pay enough for — no export connection, a constrained one, or an asset that no longer pays its way. Compute co-located with the plant turns that output into revenue, right where it is generated.
1 A better PPA on what you can exportthrough tem and P442
2 Everything else, monetisedby BLOX compute, in the Run-of-River Hydro model
Interactive 3D Island mode · load-following
The model
Run-of-River Hydro model
A 999 kW Gilkes Turgo in the Scottish Highlands, once a stranded and distressed asset, with a BLOX data centre in the powerhouse running in island mode.
  • The controller tracks the river; the compute fleet follows the power available.
  • Hydro-cooled: the racks’ heat returns to the river — no fans, no compressors.
  • Run a rainy week hour by hour, or a full hydrological year.
Explore the Run-of-River Hydro modelthe model →
How we work with generators
From your PPA to your
last kilowatt‑hour.
Whatever you generate, the pattern is the same: a working model of your site, a better PPA through tem, then compute for everything else.
  1. 1
    We model your site
    Your plant, your connection, your PPA and your generation profile, simulated half-hour by half-hour — just like these.
  2. 2
    tem lands a better PPA
    Your eligible output, linked to UK businesses’ usage under P442 and priced by tem.
  3. 3
    BLOX monetises the excess
    Our containerised data centre sits beside your plant: export when the grid pays for it, compute when it can’t take it or won’t pay enough.
Have generation?
Let’s talk about your site.
Tell us what you generate, how it connects and who buys your power today. We’ll talk you through a better PPA with tem, and where compute could fit.
callum@renewablox.com →
© 2026 RenewaBlox Ltd · callum@renewablox.com PPAs through tem depend on eligibility under P442 · illustrative simulations, not forecasts or guarantees.